Over 10,000 square metres of the Thermo Ash decking using the Grad ‘hidden-fix’ system was supplied for multiple external areas on the Turbine Halls at the Battersea Power Station redevelopment including the private roof terraces and balconies of the sky villas on the roof of the building.

Thermo Ash decking was installed using Grad aluminium rails with factory-placed clips for perfect alignment, placed on Buzon PB pedestals where required.

The use of the Grad aluminium railing system contributed to significant savings on the labour cost of installation.