National Grid needed to boost the flow of electricity from Scotland to England. To achieve this, additional equipment was required at the 400 kV Hutton Substation near Kendal in Cumbria. A key challenge was to re-profile the existing severely sloping site to create a platform for the installation of the new equipment whilst maintaining the