Projects and case studies featuring ground engineering on EXTERNAL WORKS. Inspiration and ideas to help you find the best solution for your project.
1-15 of 371
  • Phi Group: Andacrib retaining walls for A2 junction improvements
    Andacrib retaining walls for A2 junction improvements
    Phi Group
    Project, 18 August 2021
    Project
    SAVE Project
  • GreenBlue Urban Ltd: Soil cells for remodelling of Old Guys' General Court
    Soil cells for remodelling of Old Guys' General Court
    GreenBlue Urban Ltd
    Project, 22 July 2020
    Project
    SAVE Project
  • Phi Group: Soil nailed slope for University construction site
    Soil nailed slope for University construction site
    Phi Group
    Project, 31 March 2020
    Project
    SAVE Project
  • Gravitas International: Flex MSE vegetated wall system repairs lake shoreline
    Flex MSE vegetated wall system repairs lake shoreline
    Gravitas International
    Project, 31 October 2019
    Project
    SAVE Project
  • Hugh Pearl (Land Drainage): Excavations for a new reservoir
    Excavations for a new reservoir
    Hugh Pearl (Land Drainage)
    Project, 16 October 2019
    Project
    SAVE Project
  • Tobermore: £4.6m Priority School Achieves Success in St. Helens
    £4.6m Priority School Achieves Success in St. Helens
    Tobermore
    Project, 12 January 2016
    Project
    SAVE Project
  • Gravitas International: Flex MSE for tieback gravity wall along creek
    Flex MSE for tieback gravity wall along creek
    Gravitas International
    Project, 30 May 2018
    Project
    SAVE Project
  • Keller UK: Installation of SFA piles for new rail station platform
    Installation of SFA piles for new rail station platform
    Keller UK
    Project, 17 February 2020
    Project
    SAVE Project
  • Tobermore: Retaining Wall Provided for Sloping Upmarket Development
    Retaining Wall Provided for Sloping Upmarket Development
    Tobermore
    Project, 25 April 2022
    Project
    SAVE Project
  • Platipus Anchors Ltd: Stabilisation and remediation of collapsed riverbank
    Stabilisation and remediation of collapsed riverbank
    Platipus Anchors Ltd
    Project, 01 April 2022
    Project
    SAVE Project
  • CLD Fencing Systems: Exempla™ mesh fencing secures animals at Chester Zoo
    Exempla™ mesh fencing secures animals at Chester Zoo
    CLD Fencing Systems
    Project, 12 July 2019
    Project
    SAVE Project
  • Gravitas International: Flex MSE system replaces worn revetments at SSSI
    Flex MSE system replaces worn revetments at SSSI
    Gravitas International
    Project, 09 July 2020
    Project
    SAVE Project
  • Keller UK: Slope stabilisation for new unit at industrial park
    Slope stabilisation for new unit at industrial park
    Keller UK
    Project, 17 February 2020
    Project
    SAVE Project
  • Phi Group: Gabion retaining wall systems for hotel and car park
    Gabion retaining wall systems for hotel and car park
    Phi Group
    Project, 20 May 2020
    Project
    SAVE Project
  • Hardscape Resourcing Limited: Gravel stabilisation, Crookham Peace Garden
    Gravel stabilisation, Crookham Peace Garden
    Hardscape Resourcing Limited
    Project, 06 November 2017
    Project
    SAVE Project
  • Phi Group: Andacrib retaining walls for A2 junction improvements
    Andacrib retaining walls for A2 junction improvements
    Phi Group
    Phi Group has commenced work on retaining walls for Balfour Beatty's A2 Bean and Ebbsfleet Junction Improvements project for Highways England. Early collaboration between Phi Group, Balfour Beatty and the scheme designer Atkins...
    SAVE Project
  • GreenBlue Urban Ltd: Soil cells for remodelling of Old Guys' General Court
    Soil cells for remodelling of Old Guys' General Court
    GreenBlue Urban Ltd
    RootSpace 600 soil cells, the ArborGuy tree guying system and Castle tree grilles have been used in the remodelling of the main quadrangle of Old Guys Hospital. The General Court, completed in 1738, was used for many years as a...
    SAVE Project
  • Phi Group: Soil nailed slope for University construction site
    Soil nailed slope for University construction site
    Phi Group
    A substantial soil nailed slope was required by the University of Exeter to enable construction of new accommodation blocks for 1200 students. The site topography meant that the slope to the rear need to be excavated into to...
    SAVE Project
  • Gravitas International: Flex MSE vegetated wall system repairs lake shoreline
    Flex MSE vegetated wall system repairs lake shoreline
    Gravitas International
    Flex MSE was used to repair and strengthen a lake shoreline near a private property which was being eroded by water movement. Flex MSE has 100% of its strength the day installation is completed, unlike traditional systems that...
    SAVE Project
  • Hugh Pearl (Land Drainage): Excavations for a new reservoir
    Excavations for a new reservoir
    Hugh Pearl (Land Drainage)
    Hugh Pearl undertook excavations for a new agricultural reservoir for a client near Writtle, Essex.
    SAVE Project
  • Tobermore: £4.6m Priority School Achieves Success in St. Helens
    £4.6m Priority School Achieves Success in St. Helens
    Tobermore
    Mill Green School is a co-educational specialised development for 11-19 year olds, created to provide seamless special needs education in St Helens. Designed by Aedas Architects Ltd, the school has recently been successful...
    SAVE Project
  • Gravitas International: Flex MSE for tieback gravity wall along creek
    Flex MSE for tieback gravity wall along creek
    Gravitas International
    Flex MSE Vegetated Wall System was installed as a tie-back gravity wall along the bank of a creek. The length of the filled units were used to tie back into the bank, without requiring further reinforcement. The Flex MSE bank...
    SAVE Project
  • Keller UK: Installation of SFA piles for new rail station platform
    Installation of SFA piles for new rail station platform
    Keller UK
    Keller undertook the installation of a number of 600mm, 450mm and 300mm SFA piles to support the construction of the new railway platforms at Hayes and Harlington Station
    SAVE Project
  • Tobermore: Retaining Wall Provided for Sloping Upmarket Development
    Retaining Wall Provided for Sloping Upmarket Development
    Tobermore
    The upmarket development was built on a sloping site which required an attractive retaining wall. A large retaining wall was required but space was limited. The retaining wall needed to incorporate corners, curves and steps, as...
    SAVE Project
  • Platipus Anchors Ltd: Stabilisation and remediation of collapsed riverbank
    Stabilisation and remediation of collapsed riverbank
    Platipus Anchors Ltd
    Under-cutting of the riverbank by storm water flowing along Farnley Beck resulted in a collapse of the bank, leading to the relocation of the bus stop on Pudsey Road, just outside Leeds. Leeds City Council, invited specialists...
    SAVE Project
  • CLD Fencing Systems: Exempla™ mesh fencing secures animals at Chester Zoo
    Exempla™ mesh fencing secures animals at Chester Zoo
    CLD Fencing Systems
    Chester Zoo, the UK’s number one zoo and leading charity for wildlife conservation, was the first of its kind over 80 years ago not to use bars to house its animals. Today it keeps 11,000 animals inside its huge 110-acre site.
    SAVE Project
  • Gravitas International: Flex MSE system replaces worn revetments at SSSI
    Flex MSE system replaces worn revetments at SSSI
    Gravitas International
    A Flex MSE vegetated wall system was installed to replace 300m-worth of failed timber revetment at a Site of Special Scientific Interest (SSSI) with nearly 25 designations. The Flex MSE units were filled using site-won material...
    SAVE Project
  • Keller UK: Slope stabilisation for new unit at industrial park
    Slope stabilisation for new unit at industrial park
    Keller UK
    The development of a new unit at Logic Park Industrial Park, Leeds, required regrading of part of the sloping site and steepening of the slope to the North of the unit. During the main works Keller installed soil nails to the...
    SAVE Project
  • Phi Group: Gabion retaining wall systems for hotel and car park
    Gabion retaining wall systems for hotel and car park
    Phi Group
    Several gabion retaining wall systems were required for the boundaries and terraces of the new 128 bed Hampton by Hilton Hotel. The site posed a number of challenges which Phi Group helped solve
    SAVE Project
  • Hardscape Resourcing Limited: Gravel stabilisation, Crookham Peace Garden
    Gravel stabilisation, Crookham Peace Garden
    Hardscape Resourcing Limited
    The Peace and Reconciliation garden around Crookham United Reform Church in Northumberland was designed and created as part of the Flodden 500 Commemorations, marking the 500th anniversary of the Battle of Flodden, which was...
    SAVE Project