Phi Group completed the design, supply and installation of a BBA-certified Permacrib timber crib retaining wall for Taylor Wimpey at their development in Nailsea, near Bristol.

This retaining wall is the first of five that Phil Group will be installing on the development and is over 100m long with a maximum retained height of 2.2m.

As well as constructing the Permacrib retaining wall, the company also installed climb prevention mesh to the front face, as it will be in the back gardens of the new homes.