Nice - special offer
Legato perimeter push wall for metal recycling facility

Legato perimeter push wall for metal recycling facility

Elite Precast’s Legato interlocking concrete blocks were used to create a 120m-long, 3.2m-high perimeter push wall for an east London metal recycling facility. After Elite delivered the 441 blocks required for the project it took two men just 4 days to build the entire structure
Elite Precast Concrete
  • PROJECT

Retaining walls - projects from other companies

Retaining walls - companies

This site uses cookies to enhance user experience.