Channel
Showing best results - all illustrated entries. Change the channel to view specific categories.
Gantries
(8)
Gantries for motorways, roads and railways to direct and warn drivers. Find the best solution for your project here.
Gantries - helping you find the best solution for your project.
Cantilever gantries
Visit site
Cantilever gantries appear on the side of motorways to notify drivers of potential problems ahead including accidents and adverse weather conditions. They incorporate illuminated variable message signage (VMS), or fixed signage in applications where a full roadway gantry is not suitable. Nusteel Structures designs, fabricates and treats the- PRODUCT
- Nusteel Structures
Portal gantries
Visit site
Nusteel is a specialist in the design, fabrication and installation of gantries and has been producing gantries for over 65 years. The company has been responsible for many of the structures currently in use over both the road and rail transport networks around the United Kingdom. As well as producing full access portal gantries, Nusteel has also- PRODUCT
- Nusteel Structures
Gantries for M4 J9 to J12 smart motorway
Visit site
As part of the UK’S largest smart motorway scheme, Nusteel wascontracted to manufacture and install 62 new gantry structures and remove/recycle 41 existing gantries on the M4 motorway between junctions 9 and 12. A total of ten non-access portals gantries ranging in length from 37 to 44m, 19 non-access long-span super-cantilever structures, 24 MS4- PROJECT
- Nusteel Structures
Gantries and height barriers for Eurotunnel
Visit site
Nusteel's directly employed experienced teams fabricated, painted, fitted out and installed two new full access cantilever gantries and one new 14m height barrier, and completed modifications to three existing gantries at Eurotunnel- PROJECT
- Nusteel Structures
For this large scheme, Nusteel was contracted to manufacture and install 39 new gantry structures, remove and dispose of 28 existing gantries, and modify and refurbish 17 existing gantries on the M6 motorway between junctions 2 and 4. A total of eight full access portal gantries ranging in length from 40 to 46m, three non-access portal gantries up- PROJECT
- Nusteel Structures
Gantries for M1 J23A to 25 smart motorway
Visit site
For this large smart motorway scheme, Nusteel was contracted to manufacture and install new gantry structures, remove and dispose of existing gantries and modify and refurbish existing gantries on the M1 motorway between junctions 23A and 25. A total of three full access portals gantries ranging in length from 42 to 56m, twelve full access MS4- PROJECT
- Nusteel Structures
The total remodelling of the M1 Junction 19/M6 interchange required extensive new signage and direction information equipment. Nusteel was awarded the contract to manufacture and install 12 new non-access superspan portal gantries to support this equipment. The gantry spans ranged from 43 to 62m in length. Fabrication operations were carried out- PROJECT
- Nusteel Structures
Gantries - helping you find the best companies for your project.

Sign up to receive the free EXTERNAL WORKS bulletin
By signing up, you agree to our Terms and Conditions and Privacy Policy.
We won't share your email address with anyone without your consent. Bulletins are sent on a weekly basis. You can unsubscribe anytime.