For this large scheme, Nusteel was contracted to manufacture and install 39 new gantry structures, remove and dispose of 28 existing gantries, and modify and refurbish 17 existing gantries on the M6 motorway between junctions 2 and 4. A total of eight full access portal gantries ranging in length from 40 to 46m, three non-access portal gantries up