Challenge

Redlynch was asked to design a new play frame for a primary school in Cornwall, ready for the 2025 autumn term.

Part of a larger group of schools, the head teacher was looking to recreate the fun and challenge on a similar frame installed by the company 3 years previously.

Solution

Redlynch installed a large Motoric Track from Lappset, complete with a host of play features to ensure countless hours of fun for the children at break times, aiming to avoid the boredom often witnessed at other schools where a simple trim trial is provided. The play structure includes monkey bars, fireman’s poles, rope nets, bridges, arched climbers,  step climbers, and much more, giving multiple different routes around the track, each varying in challenge and difficulty.

The safety surface saw a black with yellow fleck wet pour rubber surface installed, laid at depths providing the required protection for the critical fall heights present.