We have been helping designers and specifiers find the best solutions for their projects since 1988. EXTERNAL WORKS is an ESI.info brand.
Rapid deployment temporary perimeter fencing in Central London
Tideway’s Super Sewer is transforming London’s wastewater infrastructure to meet the city’s future needs and reconnect people with the River Thames. The Thames Tideway Tunnel is a 25-kilometre interception, storage, and transfer tunnel running up to 65 meters beneath the river, one of the most ambitious infrastructure projects of its kind in
Click for full image
Rapid deployment temporary perimeter fencing in Central London
Tideway’s Super Sewer is transforming London’s wastewater infrastructure to meet the city’s future needs and reconnect people with the River Thames. The Thames Tideway Tunnel is a 25-kilometre interception, storage, and transfer tunnel running up to 65 meters beneath the river, one of the most ambitious infrastructure projects of its kind in Europe.
CLD worked in partnership with contractor Tideway to deliver temporary perimeter solutions at key sites including Deptford Park and Blackfriars. FenceSafe on-ground system enabled rapid deployment without ground penetration—ideal for urban environments with strict environmental and operational constraints.
These installations demonstrate CLD’s ability to provide secure, flexible and non-intrusive perimeter protection for complex infrastructure works in densely populated areas.