FP McCann’s back-bolted segmental shaft rings have been used to build a 20.0m id storm overflow holding tank
To complete the shaft build, a central column consisting of FP McCann 3600mm diameter caisson rings has been constructed
Segmental shafts during installation
The 20.0m id shaft has been sunk 14.0 metres deep using the jacked caisson method of construction
Shaft segments are all factory fitted with EPDM rubber gaskets which provide an immediate water-tight seal
FP McCann’s back-bolted segmental shaft rings have been used to build a 20.0m id storm overflow holding tank