It was key to the supply chain that POLYdeck™ were able to do all calculations, GA drawings and installation if required
Designed to accommodate a 10KN point loading for equestrian use and incorporate a 1.8m high parapet handrail as per regs
Given the remote location of the bridge, the lightweight GRP structure ensured a speedy installation within two days
Interested in this product?
Select image for download
Select the images you'd like and we'll send you the best versions we have in a zip file with the supplier's website address, phone number and email address and a link to the source page
Want to find out more?
Select images
Select the images you'd like and we'll send you the best versions we have in a zip file with the supplier's website address, phone number and email address and a link to the source page