Challenge

Bison supplied a fully-assembled 10m-long pedestrian bridge to Cowran Estate Services, who had been contracted by the Highways department to re-route a water course near Morseby Hall, Cumbria.

Access to build the bridge on site was challenging due to muddy ground conditions.

Requirement

Bison supplied a fully pre-assembled, long-life steel structure pedestrian bridge, within 1 week of the order being placed.

Cowran Estates craned the bridge directly onto the concrete abutments.

Specifications

  • Length: 10m

  • Width: 1.2m

  • Galvanised steel structure

  • None slip timer deck board

  • Redwood timber parapet