Project experience Schools / nurseries
Services Design
Fabrication
Installation
Client Royal Guildford School, Dubai
Consultant Desert Ink (landscape architect)
Contractor Timberplay / Desert Leisure
 
 

Overview

Having previously worked in collaboration with Desert Ink, one of Dubai’s biggest Landscape Architecture firms, Timberplay was introduced to the client at the Royal Guildford School to offer specialist play design services for the new school campus in Dubai, a truly inspiring project which includes natural play opportunities throughout the outside spaces.

Aim

Opened in 2021, Royal Guildford School Dubai has been built to inspirit the Royal Guildford School, one of the most respected schools in the UK, which has excelled for over 500 years. The client wished to replicate the same high standards at RGS in Dubai and, in order to do this, focused their efforts on creating a campus that is far more than just classrooms. Their drive was to create a school that inspired the future through high-quality educational design and sustainability.

Work undertaken

Directly working with the client, main contractor, Desert Leisure, and collaborating with the Desert Ink Landscape team, Timberplay designed, supplied and installed five different play areas to target different school years, up to the age of 11. Each site is designed with risk and challenge in mind to ensure there are development opportunities as the children grow older and become more confident with play and their physical ability.

Nursery

This area includes several pieces for younger children to explore, such as playhouses and tunnels; accompanying these are creative play elements such as drawing boards and a drawing table.

Reception, Year 1 and Year 2

These areas begin to challenge children further physically with tower and hut combinations; bridges, rope nets, slides and climbing walls offer exploratory chances for students to socially challenge themselves alongside their peers. Alongside the physical play, these spaces also introduce children to sensory experiences, allowing students to play with sound through wind pipes and conferences, and sight through distorting mirrors. Water play spaces, including playground pumps and channels, are provided for all areas, creating playful places for children to learn about water flow.

Juniors

This area incorporates much more significant structures, including Climbing Structure 07 and a Castle Tower with a large tunnel slide for children to test their limits. A see-saw and playful seating allow the older children to gather and socialise.

Installation

On-site, Timberplay worked with the main contractor, Desert Leisure, to provide specialist installation support over a month-long period. This included the team helping the contractor set out the site, prepare and install foundations and install the playground equipment. The Timberplay installation team provided invaluable experience in European Safety standards EN1166 / EN1167 to the contractor to ensure that the play areas were compliant.

Outcome

A testament to the great work of Desert Ink’s team, the landscape throughout the school allows for playful routes and natural play experiences, from the wealth of trees to the use of sand as a safety surfacing element for children to explore.


Overview

Having previously worked in collaboration with Desert Ink, one of Dubai’s biggest Landscape Architecture firms, Timberplay was introduced to the client at the Royal Guildford School to offer specialist play design services for the new school campus in Dubai, a truly inspiring project which includes natural play opportunities throughout the outside spaces.

Aim

Opened in 2021, Royal Guildford School Dubai has been built to inspirit the Royal Guildford School, one of the most respected schools in the UK, which has excelled for over 500 years. The client wished to replicate the same high standards at RGS in Dubai and, in order to do this, focused their efforts on creating a campus that is far more than just classrooms. Their drive was to create a school that inspired the future through high-quality educational design and sustainability.

Work undertaken

Directly working with the client, main contractor, Desert Leisure, and collaborating with the Desert Ink Landscape team, Timberplay designed, supplied and installed five different play areas to target different school years, up to the age of 11. Each site is designed with risk and challenge in mind to ensure there are development opportunities as the children grow older and become more confident with play and their physical ability.

Nursery

This area includes several pieces for younger children to explore, such as playhouses and tunnels; accompanying these are creative play elements such as drawing boards and a drawing table.

Reception, Year 1 and Year 2

These areas begin to challenge children further physically with tower and hut combinations; bridges, rope nets, slides and climbing walls offer exploratory chances for students to socially challenge themselves alongside their peers. Alongside the physical play, these spaces also introduce children to sensory experiences, allowing students to play with sound through wind pipes and conferences, and sight through distorting mirrors. Water play spaces, including playground pumps and channels, are provided for all areas, creating playful places for children to learn about water flow.

Juniors

This area incorporates much more significant structures, including Climbing Structure 07 and a Castle Tower with a large tunnel slide for children to test their limits. A see-saw and playful seating allow the older children to gather and socialise.

Installation

On-site, Timberplay worked with the main contractor, Desert Leisure, to provide specialist installation support over a month-long period. This included the team helping the contractor set out the site, prepare and install foundations and install the playground equipment. The Timberplay installation team provided invaluable experience in European Safety standards EN1166 / EN1167 to the contractor to ensure that the play areas were compliant.

Outcome

A testament to the great work of Desert Ink’s team, the landscape throughout the school allows for playful routes and natural play experiences, from the wealth of trees to the use of sand as a safety surfacing element for children to explore.


 
 
 
Enquire
 

Related entries

  • Timberplay: Climbing Structure 07 play equipment
    Climbing Structure 07 play equipment
    Timberplay
    Climbing Structure 07 is made from hand-processed irregular round logs. It can easily be integrated into a strongly nature-orientated environment due to its expressive yet natural character. Many children can play within a small...
  • Timberplay: Playground Pump for water play
    Playground Pump for water play
    Timberplay
    When water is required for playing, a stream normally is the most beautiful source. However, it is very rare to find this natural possibility within a play area. Nevertheless, one does not want to do without running water - even...
  • Timberplay: Richter Spielgerate Archimedes Screw for water play
    Richter Spielgerate Archimedes Screw for water play
    Timberplay
    A floating water supply is often the central feature of water play and a great way of moving water from a lower to a higher level is with the Archimedes Screw from Richter Spielgerate. Its turning draws water from the lower basin...
  • Timberplay: Concrete Stroking Stones
    Concrete Stroking Stones
    Timberplay
    Concrete Stroking Stones creatures offer a gentle play opportunity for children. Their calm expressions create a peaceful atmosphere, making an encounter with the animals a friendly experience. The stone animals are ideal to...
Not found what you're looking for? View other options