Context

As part of The City of London public realm improvements, 245m2 of Terrabound resin bound surfacing was selected for the development of the area at the junction of Monument and Lower Thames Street in London.

Project details

Addagrip approved contractor Total Protection Ltd was appointed by J.B. Riney & Co Ltd to install BBA-approved Terrabound resin bound surfacing at this busy pedestrian area as part of the improvements which included the addition of new planters, seating and trees.

The client was looking for a seamless, porous and robust paving material to cope with the heavy footfall of pedestrian traffic.

A Terrabound 6mm Peanut blend was selected to match the tones of the surrounding buildings and provide a contrast to the grey stone raised planters already in situ.

Due to the very busy location, Total Protection operatives began works early in the morning to beat most of the rush hour and complete the entirety of the 245m2 area in a single morning to minimise disruption.

Outcome

Work was completed to schedule in April 2019 to the satisfaction of the client.


Context

As part of The City of London public realm improvements, 245m2 of Terrabound resin bound surfacing was selected for the development of the area at the junction of Monument and Lower Thames Street in London.

Project details

Addagrip approved contractor Total Protection Ltd was appointed by J.B. Riney & Co Ltd to install BBA-approved Terrabound resin bound surfacing at this busy pedestrian area as part of the improvements which included the addition of new planters, seating and trees.

The client was looking for a seamless, porous and robust paving material to cope with the heavy footfall of pedestrian traffic.

A Terrabound 6mm Peanut blend was selected to match the tones of the surrounding buildings and provide a contrast to the grey stone raised planters already in situ.

Due to the very busy location, Total Protection operatives began works early in the morning to beat most of the rush hour and complete the entirety of the 245m2 area in a single morning to minimise disruption.

Outcome

Work was completed to schedule in April 2019 to the satisfaction of the client.


Interested in this project?
Call 01825 761333
OR
 
 
 
Downloads
  • Terrabound data sheet
    Terrabound data sheet
    2pp 168.94KB
    Download
  • BBA certificate: Terrabound
    BBA certificate: Terrabound
    7pp 1.44MB
    Download
 
 
 
Enquire
 


Related entries

  • Addagrip Terraco: Terrabound commercial grade resin bound surfacing
    Terrabound commercial grade resin bound surfacing
    Addagrip Terraco
    Terrabound is a commercial grade resin bound surfacing system, introduced to provide a more cost effective solution for large and small projects. Terrabound is available in a select range of natural aggregates and provides a...

Also by Addagrip Terraco

Addagrip Terraco address and contact details

Addagrip Terraco Ltd
Addagrip House
Bell Lane Industrial Estate
Uckfield
TN22 1QL
Tel: 01825 761333
View on map
 
Follow Addagrip Terraco
 
Not found what you're looking for? View other options

Ask Addagrip Terraco about

Resin bound surfacing for central London street scheme