Context

Althon supplied the marina at Upton-upon-Severn with two SFA27D headwalls with bolt-on toes to suit 1200mm-dia concrete pipes.

About the headwalls

Althon SFA headwalls and toes are cast with lifting points for easy and quick offloading, transporting and installing into their final position; there is no need for any specialised lifting equipment just standard lifting hooks and chains are needed to move the headwalls and toes into position.

Althon's unique Headwall Specifier is used to find the correct headwall for a project and the company will assist with pricing and design drawings detailing an appropriate headwall solution.