Sector Public realm
Project type Refurbishment
Services provided Product / system manufacture
Product / system supply
Year completed 2017
Project location London
Products used DekorGrip Resin Bound surfacing in Rich Havana
 
 

Challenge

A junction situated next to Mornington Crescent underground station in London was in need of a refurbishment after the surface surrounding the statue of Richard Cobden had become worn down and outdated. Many locals had campaigned for the upgrade due to its lack of safety and poor visual appearance.

Consisting mainly of paving slabs, the surface was becoming more unsafe due to eventual unevenness causing trip hazards. It was important that the surface be replaced with a safe and attractive solution.

Solution

A DekorGrip Resin Bound surfacing system was selected in Rich Havana to create an attractive finish that would complement the statue and its surrounding area.

Installation was carried out and completed around the statue and throughout Cobden Junction by one of DekorGrip’s skilled and approved installers.

Outcome

The finished surface has completely transformed the area, bringing a modern and attractive look to the junction. It now attracts many visitors every day, with people using it as a place to sit and relax - a stark contrast to before installation.


Challenge

A junction situated next to Mornington Crescent underground station in London was in need of a refurbishment after the surface surrounding the statue of Richard Cobden had become worn down and outdated. Many locals had campaigned for the upgrade due to its lack of safety and poor visual appearance.

Consisting mainly of paving slabs, the surface was becoming more unsafe due to eventual unevenness causing trip hazards. It was important that the surface be replaced with a safe and attractive solution.

Solution

A DekorGrip Resin Bound surfacing system was selected in Rich Havana to create an attractive finish that would complement the statue and its surrounding area.

Installation was carried out and completed around the statue and throughout Cobden Junction by one of DekorGrip’s skilled and approved installers.

Outcome

The finished surface has completely transformed the area, bringing a modern and attractive look to the junction. It now attracts many visitors every day, with people using it as a place to sit and relax - a stark contrast to before installation.


Interested in this project?
Call 023 9220 0606
OR
 
 
 
Downloads
  • Meon product catalogue
    Meon product catalogue
    112pp 23.59MB
    Download
  • DekorGrip Resin Bound - base build up spec
    DekorGrip Resin Bound - base build up spec
    9pp 638.39KB
    Download
  • DekorGrip Resin Bound technical info
    DekorGrip Resin Bound technical info
    2pp 638.39KB
    Download
  • DekorGrip Resin Bound surfacing - base build up spec
    DekorGrip Resin Bound surfacing - base build up spec
    7pp 192.31KB
    Download
  • Case study: Mornington Crescent
    Case study: Mornington Crescent
    1pp 752.35KB
    Download
 
 
 
Enquire
 


Not found what you're looking for? View other options

Ask Meon Ltd about

DekorGrip resin bound surfacing - Mornington Crescent