Sector Culture and heritage
Project type New build
Services provided Product / system manufacture
Product / system supply
Project location Scotland
Consultant Architect: Foster + Partners
Contractor Main Contractor: Lend Lease
Products used Roma-3 fencing and gates
 
 

 The SSE Hydro in Glasgow, with a capacity of 12,000 seating and 13,000 standing, is the biggest performance arena ever designed by Foster + Partners. The £125m concert venue forms part of a post-industrial regeneration along the once neglected Clyde waterfront.

The dramatic structure takes the form of a skewed dome, spanning 120 metres, with external walls clad in translucent air-filled ETFE cushions that can create a dazzling illuminated facade.

An elevated walkway forms one of the main points of access to the venue. Lang+Fulton supplied infill panels made from Micro-34 architectural grating for the balustrade, and the galvanised finish and rectilinear appearance complement the surrounding buildings.

The northern perimeter of the site has been secured using a Roma-3 grating fence and entrance gates to maintain overall continuity for the project.

In addition, a series of Roma-3 compounds were designed for the secure storage of deliveries for the Events Catering Department.


 The SSE Hydro in Glasgow, with a capacity of 12,000 seating and 13,000 standing, is the biggest performance arena ever designed by Foster + Partners. The £125m concert venue forms part of a post-industrial regeneration along the once neglected Clyde waterfront.

The dramatic structure takes the form of a skewed dome, spanning 120 metres, with external walls clad in translucent air-filled ETFE cushions that can create a dazzling illuminated facade.

An elevated walkway forms one of the main points of access to the venue. Lang+Fulton supplied infill panels made from Micro-34 architectural grating for the balustrade, and the galvanised finish and rectilinear appearance complement the surrounding buildings.

The northern perimeter of the site has been secured using a Roma-3 grating fence and entrance gates to maintain overall continuity for the project.

In addition, a series of Roma-3 compounds were designed for the secure storage of deliveries for the Events Catering Department.


Interested in this project?
Call 0131 441 1255
OR
 
 
 
Downloads
  • Grating Fences
    Grating Fences
    20pp 10.13MB
    Download
  • Architectural gratings for cladding, screening and balustrades
    Architectural gratings for cladding, screening and balustrades
    22pp 6.13MB
    Download
  • NBS Spec: Q40 Fencing and gates
    NBS Spec: Q40 Fencing and gates
    144.5KB
    Download
 
 
 
Enquire
 


Not found what you're looking for? View other options

Ask Lang+Fulton about

Perimeter fencing and gates for SSE Hydro