CTS manufactured a 21.5 x 3m bow-tied arch cycle bridge at Picket Twenty in Andover which was delivered to site in two halves. Community-designed artwork figures were then attached to the bridge by a local sculptor prior to it being lifted into place over the A3093 into Andover.

The new footbridge is a key link for residents in the expanding community at Picket Twenty and provides a safe crossing of a busy road for pedestrians and cyclists to the town.