The Morton Partnership supplied CTS Bridges with a design for a bridge, which was used to produce a 30x2m tubular steel arched footbridge with tensioned structural cables.

The new bridge provides a link between the sports ground and the main college building, and also allows access to members of the public.

Christopher Lewis, Dean of Christ Church College said: "We are delighted to see the completion of this beautiful bridge which we believe will greatly enhance Christ Church Meadow and the River Cherwell".