Challenge

Murrayfield Stadium is the headquarters of the Scottish Rugby Union and the home venue for Scotland's international fixtures.

In 2010 the perimeter boundary was relocated to allow for the construction of the new tram system that was being built in Edinburgh.

Solution

Lang+Fulton's Siena Sport fence was chosen to provide the security and access requirements, as well as complying with the necessary crowd control standards.

302 metres of 2400mm high fencing was supplied with IPE posts and a series of 15 double-leaf and 3 single-leaf gates.

The robust 33.7mm tubular pales with a 2mm wall thickness were centred at 132mm with a 98.3mm gap to comply with Building Regulations for anti-trap.

The system was hot-dip galvanized and polyester powder coated in RAL 7021.