Sector Industrial
Project type New build
Services provided Product / system supply
Project location East Midlands
Client Volume Developments
Products used Italia-80 steel panels; Roma-3 fencing
 
 

Challenge

TORC:MK in Milton Keynes is a prime industrial location of twelve warehouse units totalling 81,000 sq ft. The scheme by Volume Developments was constructed to a high quality specification.

Solution

Lang+Fulton supplied four 1800mm high bin stores designed from their modular system of Italia-80 steel panels which provide 80% visual screening. A special 50x50mm RHS galvanized bump rail was fitted to the interior for added protection from the industrial wheelie bins. Two installations were 4m wide, the other two were 5.2m wide. The gates were supplied with anti-lift drop bolts and euro-profile locks; the posts were fitted with base plates for ground fixing.

500 metres of 1800mm high Roma-3 fencing with flat bar posts was also supplied for an adjoining boundary with a cranked extension to one section. All steelwork was hot-dip galvanized and polyester powder coated in silver RAL9006.


Challenge

TORC:MK in Milton Keynes is a prime industrial location of twelve warehouse units totalling 81,000 sq ft. The scheme by Volume Developments was constructed to a high quality specification.

Solution

Lang+Fulton supplied four 1800mm high bin stores designed from their modular system of Italia-80 steel panels which provide 80% visual screening. A special 50x50mm RHS galvanized bump rail was fitted to the interior for added protection from the industrial wheelie bins. Two installations were 4m wide, the other two were 5.2m wide. The gates were supplied with anti-lift drop bolts and euro-profile locks; the posts were fitted with base plates for ground fixing.

500 metres of 1800mm high Roma-3 fencing with flat bar posts was also supplied for an adjoining boundary with a cranked extension to one section. All steelwork was hot-dip galvanized and polyester powder coated in silver RAL9006.


Interested in this case study?
Call 0131 441 1255
OR
 
 
 
Downloads
  • Italia-80 screens and Roma-3 fencing, TORC:MK
    Italia-80 screens and Roma-3 fencing, TORC:MK
    1pp 233.03KB
    Download
  • Louvred Fencing and Compounds
    Louvred Fencing and Compounds
    17pp 4.45MB
    Download
  • Louvred screening - Case Studies
    Louvred screening - Case Studies
    13pp 2.64MB
    Download
  • Wheelie Bin Stores
    Wheelie Bin Stores
    8pp 2.38MB
    Download
 
 
 
Enquire
 


Related entries

  • Lang+Fulton: Italia-80 louvred fencing
    Italia-80 louvred fencing
    Lang+Fulton
    Italia-80 steel louvred fencing can be supplied to any height using a combination of panels with flat bar, T-section or rectangular posts in appropriate lengths for either ground or wall fixing. Panels and posts are made to...
Not found what you're looking for? View other options

Ask Lang+Fulton about

Bin stores and fencing for warehousing at Torc:MK