Challenge

McArdle ECS Ltd, the main contractor required assistance with a specification of resin bonded surfacing for the public pedestrian areas at Ascot Racecourse. Addagrip in conjunction with one of their approved contractors, True Grip, put together a joint presentation to secure the contract.

Solution

Under a very tight deadline True Grip installed over 6,000m2 of Addastone Plus using 1-3mm Golden Pea gravel into a buff resin and despite the rigorous demands for such a prestigious project the work was completed ahead of schedule without a single snagging requirement from either McArdle or Ascot.