We have been helping designers and specifiers find the best solutions for their projects since 1988. EXTERNAL WORKS is an ESI.info brand.
520m² of Keystone supplied for new Centre Parcs village
Anderton Concrete has commenced supply of 520m² of flint coloured Keystone blocks to PC Construction. The Keystone retaining wall system is being used during the construction phase of Center Parcs’ fifth UK village, Woburn Forest in Bedfordshire. The new village is scheduled to open in Spring 2014 and will comprise 625 forest lodges, a 75 bedroom
Click for full image
Keystone being installed at new Centre Parcs village
Anderton Concrete has commenced supply of 520m² of flint coloured Keystone blocks to PC Construction. The Keystone retaining wall system is being used during the construction phase of Center Parcs’ fifth UK village, Woburn Forest in Bedfordshire.
The new village is scheduled to open in Spring 2014 and will comprise 625 forest lodges, a 75 bedroom hotel and spa with 6 associated spa suites and two leisure buildings including indoor sports facilities, subtropical swimming paradise, restaurants and retail outlets. It will also include outdoor sports and leisure facilities and a lake.