Challenge

The objective was to create a fully integrated sustainable drainage system (SuDS) to manage surface water run-off from all hard standing areas across the site.

Brief:

  1. To realise an ambitious SuDS scheme using a range of ACO products as a means of conveyance to the retention pond which controls the safe release of water into the
    adjacent stream.

  2. Installation of an ACO drainage scheme to meet the Load Class environment, the ground conditions of the site and to optimise the speed of the surface water removal, thus reducing overall construction time and cost.

Solution

Interlinked runs of ACO MultiDrain M100D fitted with cast iron gratings installed in the main 675 space car park. ACO combined KerbDrain 305 and KerbDrain 480 edging the HGV, caravan and coach park. ACO S100 cast iron drainage channels installed on the filling station forecourt.