Althon supplied a number of made-to-order precast concrete headwalls to the Third River Crossing (Herring Bridge) project in Great Yarmouth. The majority of these were supplied with fitted accessories such as Kee Klamp handrails, HDPE non-return flap valves, and pond liner brackets at the customer’s request. One of the benefits of opting for pre-fitted accessories is that less time is spent on installation, saving time for contractors.

Althon offers an impressive range of headwalls, flow control and flood prevention products and can deliver throughout the UK on its FORS-registered lorries.