Sector Healthcare
Project type New build
Services provided Product / system manufacture
Product / system supply
Year completed 2020
Project location Wales
Client Aneurin Bevan Health Board
Consultant Building Design Partnership
Contractor Landcraft Projects Ltd, Laing O’Rourke
Products used tuffbed 2-pack bedding mortar mixed with tuffgrit, tuffbond priming mortar, tufftop - natural grey jointing mortar
 
 

Overview

The Grange University Hospital was opened ahead of schedule in November 2020 to help respond to the winter season pressures and a potential Covid-19 second wave. The Hospital provides care for those who are seriously ill, have complex problems or conditions that can’t be safely managed at another local general hospital.

It uses the landscaped areas, with views across the surrounding countryside, to help promote healing and wellness for staff and patients. The largest area of the hard landscaping can be found outside the front entrance which alongside the pedestrian area includes bicycle storage, a bus stop and a one-way vehicle looped driveway.

Work undertaken

A range of Steintec mortars was selected for the installation of 3,000m2 of paving slabs and setts. The mortars were first delivered to the site in December 2019, with the project running into the initial COVID-19 outbreak and first UK lockdown. During the lockdown, Steintec's production facility was run on a skeleton service, and it was still able to supply paving products to this essential project. With the extra pressures of reduced staffing and additional safety procedures, products and tools, including the hire of forced action mixers and Pergo 880, were all still sent as required and arrived at the site on time.

Products supplied

  • tuffbed 2-pack bedding mortar mixed with tuffgrit
  • tuffbond priming mortar
  • tufftop - natural grey jointing mortar


Overview

The Grange University Hospital was opened ahead of schedule in November 2020 to help respond to the winter season pressures and a potential Covid-19 second wave. The Hospital provides care for those who are seriously ill, have complex problems or conditions that can’t be safely managed at another local general hospital.

It uses the landscaped areas, with views across the surrounding countryside, to help promote healing and wellness for staff and patients. The largest area of the hard landscaping can be found outside the front entrance which alongside the pedestrian area includes bicycle storage, a bus stop and a one-way vehicle looped driveway.

Work undertaken

A range of Steintec mortars was selected for the installation of 3,000m2 of paving slabs and setts. The mortars were first delivered to the site in December 2019, with the project running into the initial COVID-19 outbreak and first UK lockdown. During the lockdown, Steintec's production facility was run on a skeleton service, and it was still able to supply paving products to this essential project. With the extra pressures of reduced staffing and additional safety procedures, products and tools, including the hire of forced action mixers and Pergo 880, were all still sent as required and arrived at the site on time.

Products supplied

  • tuffbed 2-pack bedding mortar mixed with tuffgrit
  • tuffbond priming mortar
  • tufftop - natural grey jointing mortar


 
 
 
Downloads
  • Tuffbond Method & Technical Data
    Tuffbond Method & Technical Data
    535.8KB
    Download
  • tuffgrit Technical Data
    tuffgrit Technical Data
    665.86KB
    Download
  • Tufftop Method Statement
    Tufftop Method Statement
    755.09KB
    Download
  • Tuffbed 2-pack Method Statement
    Tuffbed 2-pack Method Statement
    803.97KB
    Download
 
 
 
Enquire
 

Related entries

  • Steintec: tuffbed 2-pack: High performance paving bedding mortar
    tuffbed 2-pack: High performance paving bedding mortar
    Steintec
    This two-part product requires no pre-drying or pre-blending of the aggregate content. The binder is packaged separately avoiding the need for energy intensive central processing. This reduces overall energy use and haulage. All...
  • Steintec: tufftop: High performance slurry applied jointing mortar
    tufftop: High performance slurry applied jointing mortar
    Steintec
    tufftop is a high performance non-permeable, self compacting free flowing slurry applied jointing mortar suitable for pavements constructed in natural stone or concrete paving units. The elastic modulus of tufftop is optimised to...
  • Steintec: tuffbond: High performance paving priming/bonding mortar
    tuffbond: High performance paving priming/bonding mortar
    Steintec
    A high performance bonding and priming mortar suitable for natural stone and pre-cast concrete paving units used in bound/rigid construction in commercial and public realm projects. tuffbond greatly enhances the bond between the...
  • Steintec: tuffgrit: Bedding aggregate for unbound paving
    tuffgrit: Bedding aggregate for unbound paving
    Steintec
    tuffgrit is a crushed rock aggregate suitable for bedding paving elements where unbound (flexible, mortar-free) construction is used. tuffgrit is an economical choice, affording longer maintenance intervals and heavier...

Also by Steintec

Steintec address and contact details

tuffbau Ltd
1 Northwick Road
Canvey Island
SS8 0PU
Tel: 020 3598 9800
View on map
 
Follow Steintec
 
Not found what you're looking for? View other options