Sector Culture and heritage
Project type Refurbishment
Services provided Product / system manufacture
Product / system supply
Project management
Installation
Project location London
Client Duke of York Square
Products used NatraTex Colour
 
 

The Duke of York Square offers fashion, beauty, food and culture in the heart of Chelsea. It is home to 30 stores and boutiques and six restaurants, food markets and the iconic Saatchi Gallery.

Also located in the grounds is a running track where Roger Bannister trained for the famous, first sub-four minute mile run. NatraTex was the preferred option for the resurfacing of the track.

In order to protect the residential and prestigious surroundings from any excess noise and disruption during the installation, acoustic barriers were supplied and erected around the full perimeter of the works.

Planing machinery and surface removal tools were then used to remove the existing, failing coloured surface.

All waste was removed from the site, with CCTV surveys of all drains undertaken along with protection of kerbs and grass, ACO Channel replacements and cable duct installations were undertaken.

The tricky logistics and tight schedule were successfully managed, and following the base-course macadam installation, the 1,972m² 6mm HD Red NatraTex wearing course was finally applied.


The Duke of York Square offers fashion, beauty, food and culture in the heart of Chelsea. It is home to 30 stores and boutiques and six restaurants, food markets and the iconic Saatchi Gallery.

Also located in the grounds is a running track where Roger Bannister trained for the famous, first sub-four minute mile run. NatraTex was the preferred option for the resurfacing of the track.

In order to protect the residential and prestigious surroundings from any excess noise and disruption during the installation, acoustic barriers were supplied and erected around the full perimeter of the works.

Planing machinery and surface removal tools were then used to remove the existing, failing coloured surface.

All waste was removed from the site, with CCTV surveys of all drains undertaken along with protection of kerbs and grass, ACO Channel replacements and cable duct installations were undertaken.

The tricky logistics and tight schedule were successfully managed, and following the base-course macadam installation, the 1,972m² 6mm HD Red NatraTex wearing course was finally applied.


 
 
 
Downloads
  • NatraTex brochure
    NatraTex brochure
    16pp 4.88MB
    Download
  • NatraTex technical guidance notes
    NatraTex technical guidance notes
    127.45KB
    Download
 
 
 
Enquire
 


Related entries

  • NatraTex: NatraTex Colour® fully-bonded surfacing
    NatraTex Colour® fully-bonded surfacing
    NatraTex
    The NatraTex Colour® range uses a clear synthetic binder and natural aggregates combined with coloured pigments to produce an attractive and durable surface. Largely maintenance-free and cost-effective when compared to other...
Not found what you're looking for? View other options

Ask NatraTex about

NatraTex Colour surfacing - Duke of York Square, London