Sector Utilities
Services provided Product / system manufacture
Product / system supply
Project location East of England
Client Essex and Suffolk Water
Products used StronGuard SR3
 
 

Requirement

When Water UK updated their Standard for Security Arrangements for Operational Assets (SSAOA) – the benchmark for safe water regulation, Essex and Suffolk Water needed to install a new type of demarcation at its water treatment works.

As a contaminated water supply is a huge public health issue, it was critical that Essex and Suffolk Water’s treatment works had exceptional security standards and was resilient against attempted attack, in addition to their 24/7 monitoring.

Product supplied

Essex and Suffolk Water selected Barkers' super-durable, LPCB-certified StronGuard SR3 palisade fencing system to protect the integrity of its site and safety of its product. This solution is purpose-built to withstand persistent attacks for up to 5 minutes and delivers outstanding performance, long-term resilience and an effective deterrent.

The Barkers' team pulled out all the stops to achieve installation in a tight timeframe and at an affordable cost. This in part is thanks to StronGuard SR3 being able to follow sloping ground without any time-consuming on-site modifications.

The product was also hot dip galvanised at Barkers’ UK site to provide decades of resistance against weather, and minimal maintenance, meaning that Essex and Suffolk Water should satisfy regulatory requirements for years to come.


Requirement

When Water UK updated their Standard for Security Arrangements for Operational Assets (SSAOA) – the benchmark for safe water regulation, Essex and Suffolk Water needed to install a new type of demarcation at its water treatment works.

As a contaminated water supply is a huge public health issue, it was critical that Essex and Suffolk Water’s treatment works had exceptional security standards and was resilient against attempted attack, in addition to their 24/7 monitoring.

Product supplied

Essex and Suffolk Water selected Barkers' super-durable, LPCB-certified StronGuard SR3 palisade fencing system to protect the integrity of its site and safety of its product. This solution is purpose-built to withstand persistent attacks for up to 5 minutes and delivers outstanding performance, long-term resilience and an effective deterrent.

The Barkers' team pulled out all the stops to achieve installation in a tight timeframe and at an affordable cost. This in part is thanks to StronGuard SR3 being able to follow sloping ground without any time-consuming on-site modifications.

The product was also hot dip galvanised at Barkers’ UK site to provide decades of resistance against weather, and minimal maintenance, meaning that Essex and Suffolk Water should satisfy regulatory requirements for years to come.


Interested in this project?
Call 01782 319264
OR
 
 
 
Downloads
  • Stronguard™ high security steel palisade fencing
    Stronguard™ high security steel palisade fencing
    2pp 638.78KB
    Download
 
 
 
Enquire
 


Related entries

  • Barkers Fencing: Palisade - GP and security grade steel palisade fencing
    Palisade - GP and security grade steel palisade fencing
    Barkers Fencing
    Barkers' Palisade fencing is manufactured and supplied in a wide range of styles, heights and designs to suit applications ranging from general purpose boundary demarcation to high security applications. Palisade is...
  • Barkers Fencing: StronGuard™ SR3 - high security steel palisade fencing
    StronGuard™ SR3 - high security steel palisade fencing
    Barkers Fencing
    Stronguard™ SR3 is a resilient, robust and effective Stronguard™ product. It provides an imposing visual deterrent and category-leading performance against attack, but remains easy to install, so is accessible to a wide...
Not found what you're looking for? View other options

Ask Barkers Fencing about

Resilient palisade fencing secures water treatment works