SDS

 
 
Sector Transport infrastructure
Services provided Product / system manufacture
Product / system supply
Year completed Oct-Dec 2018
Project location Scotland
Client P.J. Careys (Contractors) Ltd / Edinburgh Airport (Global Infrastructure Partners)
Products used GEOlight® stormwater storage tanks
 
 

Context

The second phase of Edinburgh Airport's Stands Development project will create 13 new aircraft stands as well as a new taxiway and an equipment area.

SDS systems used

SDS GEOlight® stormwater storage tanks.

Purpose

To provide the infrastructure required to support the expansion of the airport.

Brief to SDS

To ensure the airport’s new aircraft stands are flood risk free.

Project objectives

To effect the fast and efficient removal of surface water from the site and to ensure its safe dispersal to natural water receptors.

Project requirements

To mitigate anticipated flooding issues as a consequence of the airport’s expansion and to minimise the airport’s impact on the environment, whilst satisfying the environmental demands of the West Edinburgh Strategic Design Framework (WESSDF).

Surface water system requirements

Due to the remote location of these new stands, as well as future planned stand development work, passengers will be bused to and from the main terminal, once their aircraft have been safely parked. Consequently it is essential that these areas, which will be subject not just to aircraft and vehicle movements but also to foot traffic from passengers and airport personnel, should drain quickly and effectively and remain entirely free from flooding.

Furthermore, the adopted solution should reflect the council’s guidance in terms of permeability and landscape provision, as set out in the “Edinburgh Design Guidance”.

SDS product features

SDS GEOlight® tanks with a combined gross storage capacity of 7248m3.

Issues overcome

One of the challenges that this project presented was the need to carry out construction works in a live environment, both airside and landside, with planes continuing to taxi, take off and land during construction works. This required close co-operation with Edinburgh Airport security, engineering, airfield operations and air traffic control.

It was also necessary to complete the installation within a particularly tight timeframe of just 8 weeks leading up to Christmas, during inclement winter weather and reduced natural daylight hours.

Testimonial

"Despite the very short timeframe in which to complete the installation of the drainage system, the unfavourable weather and the requirement to work under floodlight, we were able to rely upon SDS, once more, to get the job done in time and to the high standards we expect and which they consistently deliver."
– Allan Crozier, Senior Project Manager, PJ Careys

(Images courtesy of Edinburgh Airport)


Context

The second phase of Edinburgh Airport's Stands Development project will create 13 new aircraft stands as well as a new taxiway and an equipment area.

SDS systems used

SDS GEOlight® stormwater storage tanks.

Purpose

To provide the infrastructure required to support the expansion of the airport.

Brief to SDS

To ensure the airport’s new aircraft stands are flood risk free.

Project objectives

To effect the fast and efficient removal of surface water from the site and to ensure its safe dispersal to natural water receptors.

Project requirements

To mitigate anticipated flooding issues as a consequence of the airport’s expansion and to minimise the airport’s impact on the environment, whilst satisfying the environmental demands of the West Edinburgh Strategic Design Framework (WESSDF).

Surface water system requirements

Due to the remote location of these new stands, as well as future planned stand development work, passengers will be bused to and from the main terminal, once their aircraft have been safely parked. Consequently it is essential that these areas, which will be subject not just to aircraft and vehicle movements but also to foot traffic from passengers and airport personnel, should drain quickly and effectively and remain entirely free from flooding.

Furthermore, the adopted solution should reflect the council’s guidance in terms of permeability and landscape provision, as set out in the “Edinburgh Design Guidance”.

SDS product features

SDS GEOlight® tanks with a combined gross storage capacity of 7248m3.

Issues overcome

One of the challenges that this project presented was the need to carry out construction works in a live environment, both airside and landside, with planes continuing to taxi, take off and land during construction works. This required close co-operation with Edinburgh Airport security, engineering, airfield operations and air traffic control.

It was also necessary to complete the installation within a particularly tight timeframe of just 8 weeks leading up to Christmas, during inclement winter weather and reduced natural daylight hours.

Testimonial

"Despite the very short timeframe in which to complete the installation of the drainage system, the unfavourable weather and the requirement to work under floodlight, we were able to rely upon SDS, once more, to get the job done in time and to the high standards we expect and which they consistently deliver."
– Allan Crozier, Senior Project Manager, PJ Careys

(Images courtesy of Edinburgh Airport)


Interested in this project?
Call 01934 751303
OR
 
 
 
Downloads
  • SDS GEOlight™ Stormwater Management Systems
    SDS GEOlight™ Stormwater Management Systems
    2pp 1.18MB
    Download
 
 
 
Enquire
 


Related entries

  • SDS: SDS GEOlight® Modular Underground Stormwater Storage
    SDS GEOlight® Modular Underground Stormwater Storage
    SDS
    GEOlight® stormwater management units are suitable for use in sustainable drainage systems (SuDS) for stormwater attenuation or soakaway infiltration. The units are PVC modular honeycomb structures with high capacity, high...