1-5 of 5

ABG Geosynthetics

   Holmfirth, HD9 4DS   View on map
Call 01484 852096   Visit website
  • ABG Geosynthetics: Permeable SuDS paving for HGV truck stop parking
    Permeable SuDS paving for HGV truck stop parking
    ABG Geosynthetics
    ABG Truckcell was used to provide a permeable SuDS HGV parking area for the Hollies Transport Cafe which has been serving drivers and travellers on Watling Street (A5) since 1933. Hundreds of HGVs visit the site each week.
  • SuDS porous gravel paving - Derby University
    ABG Geosynthetics
    ABG's Sudspave® porous pavement system was used on a new development for Derby University. The product was used to form gravel surfaced vehicle access routes which form part of the overall SuDS design for the site
  • SuDS-compliant porous paving - Truro Park & Ride
    ABG Geosynthetics
    Truro Eastern Park & Ride facility in Cornwall aimed to create 1800 car parking spaces and spaces for coaches to reduce traffic entering the town by 15%. ABG supplied a range of cost-effective, SuDS-compliant geosynthetic...
  • Truckcell™ paving installation helps ease M1 congestion
    ABG Geosynthetics
    Emergency Turnaround Areas improve motorway traffic flow and ease congestion. Used with removable gates within central reservations, ETAs enable the Highways Agency, in the event of an accident, to bring traffic management...
  • Tree root protection, Center Parcs, Woburn
    ABG Geosynthetics
    Center Parcs, Woburn Forest is the holiday chain’s fifth village development in the UK. The requirements of the planning consent included building new infrastructure, and these works had to be undertaken in a method...
  • SuDS porous gravel paving - Derby University
    ABG Geosynthetics
    ABG's Sudspave® porous pavement system was used on a new development for Derby University. The product was used to form gravel surfaced vehicle access routes which form part of the overall SuDS design for the site
  • SuDS-compliant porous paving - Truro Park & Ride
    ABG Geosynthetics
    Truro Eastern Park & Ride facility in Cornwall aimed to create 1800 car parking spaces and spaces for coaches to reduce traffic entering the town by 15%. ABG supplied a range of cost-effective, SuDS-compliant geosynthetic...
  • Truckcell™ paving installation helps ease M1 congestion
    ABG Geosynthetics
    Emergency Turnaround Areas improve motorway traffic flow and ease congestion. Used with removable gates within central reservations, ETAs enable the Highways Agency, in the event of an accident, to bring traffic management...
  • Tree root protection, Center Parcs, Woburn
    ABG Geosynthetics
    Center Parcs, Woburn Forest is the holiday chain’s fifth village development in the UK. The requirements of the planning consent included building new infrastructure, and these works had to be undertaken in a method...