Projects and case studies featuring ground engineering on EXTERNAL WORKS. Inspiration and ideas to help you find the best solution for your project.
1-15 of 352
  • Terram: BODPAVE 40 grass filled porous paver - overflow car park
    BODPAVE 40 grass filled porous paver - overflow car park
    Terram
    Project, 07 August 2017
    Project
    SAVE Project
  • Marshalls - civils and drainage: Modular retaining wall system allows more parking space
    Modular retaining wall system allows more parking space
    Marshalls - civils and drainage
    Project, 07 August 2019
    Project
    SAVE Project
  • Keller UK: Slope stabilisation for new unit at industrial park
    Slope stabilisation for new unit at industrial park
    Keller UK
    Project, 17 February 2020
    Project
    SAVE Project
  • Phi Group: Permacrib retaining wall, Sainsbury's
    Permacrib retaining wall, Sainsbury's
    Phi Group
    Project, 09 May 2016
    Project
    SAVE Project
  • GoPlastic: River and canal bank retention system - Technic
    River and canal bank retention system - Technic
    GoPlastic
    Project, 20 May 2020
    Project
    SAVE Project
  • ACO Water Management: GroundGuard grass surface repair, Faversham Golf Course
    GroundGuard grass surface repair, Faversham Golf Course
    ACO Water Management
    Project, 29 June 2015
    Project
    SAVE Project
  • Phi Group: Concrete retaining wall system for water treatment works
    Concrete retaining wall system for water treatment works
    Phi Group
    Project, 31 March 2020
    Project
    SAVE Project
  • Phi Group: Retaining wall and reinforced soil slope for A21 road
    Retaining wall and reinforced soil slope for A21 road
    Phi Group
    Project, 19 June 2017
    Project
    SAVE Project
  • URBASTYLE®: Concrete architectural retaining walls for high school
    Concrete architectural retaining walls for high school
    URBASTYLE®
    Project, 03 July 2019
    Project
    SAVE Project
  • Platipus Anchors Ltd: Percussion Driven Earth Anchors (PDEA®) - Milton Keynes
    Percussion Driven Earth Anchors (PDEA®) - Milton Keynes
    Platipus Anchors Ltd
    Project, 13 May 2019
    Project
    SAVE Project
  • Greenfix Soil Stabilisation & Erosion Control: Envirolok® - Case Study Kingston University
    Envirolok® - Case Study Kingston University
    Greenfix Soil Stabilisation & Erosion Control
    Project, 24 February 2020
    Project
    SAVE Project
  • Phi Group: Gabion baskets support existing stone wall at university
    Gabion baskets support existing stone wall at university
    Phi Group
    Project, 07 March 2019
    Project
    SAVE Project
  • Phi Group: Soil nailed slope for University construction site
    Soil nailed slope for University construction site
    Phi Group
    Project, 31 March 2020
    Project
    SAVE Project
  • Keller UK: CFA piling for new flats and offices above rail station
    CFA piling for new flats and offices above rail station
    Keller UK
    Project, 17 February 2020
    Project
    SAVE Project
  • Terram: Permeable gravel car park, Chatham Docks
    Permeable gravel car park, Chatham Docks
    Terram
    Project, 07 August 2017
    Project
    SAVE Project
  • Terram: BODPAVE 40 grass filled porous paver - overflow car park
    BODPAVE 40 grass filled porous paver - overflow car park
    Terram
    The permanent grassed overflow car park historically suffered with the problem of vehicles damaging the grass and creating extensive rutting and an uneven, muddy/unpleasant parking situation throughout the year. The National...
    SAVE Project
  • Marshalls - civils and drainage: Modular retaining wall system allows more parking space
    Modular retaining wall system allows more parking space
    Marshalls - civils and drainage
    Redi-Rock modular walling was used at Fox Valley retail park to ensure that the maximum amount of space was optimised for car parking in the facility. Redi-Rock is versatile enough to achieve height without compromising on...
    SAVE Project
  • Keller UK: Slope stabilisation for new unit at industrial park
    Slope stabilisation for new unit at industrial park
    Keller UK
    The development of a new unit at Logic Park Industrial Park, Leeds, required regrading of part of the sloping site and steepening of the slope to the North of the unit. During the main works Keller installed soil nails to the...
    SAVE Project
  • Phi Group: Permacrib retaining wall, Sainsbury's
    Permacrib retaining wall, Sainsbury's
    Phi Group
    Phi Group suggested its Permacrib Timber Crib as the solution to a 180m wall that was to retain a car parking area above a new Sainsbury's distribution centre, and made bespoke design alterations to create a steeper profile
    SAVE Project
  • GoPlastic: River and canal bank retention system - Technic
    River and canal bank retention system - Technic
    GoPlastic
    The Technic bank retention system was specified to prevent erosion and strengthen the bank margins of a canal running through the city of Hoorn in the Netherlands. Over 10 kilometers of Technic Bank Retention system was installed...
    SAVE Project
  • ACO Water Management: GroundGuard grass surface repair, Faversham Golf Course
    GroundGuard grass surface repair, Faversham Golf Course
    ACO Water Management
    Faversham Golf Club in Kent required a system which would preserve natural appearance of the course whilst providing a ground stabilisation solution. The brief was to repair key areas of its grassed playing surface that had been...
    SAVE Project
  • Phi Group: Concrete retaining wall system for water treatment works
    Concrete retaining wall system for water treatment works
    Phi Group
    A £22M scheme for Scottish Water to improve water quality for villages south of Inverness required a concrete crib wall to create a level area for construction work. The first phase of the Andacrib concrete crib wall installation...
    SAVE Project
  • Phi Group: Retaining wall and reinforced soil slope for A21 road
    Retaining wall and reinforced soil slope for A21 road
    Phi Group
    Phi Group was contracted to construct a number of reinforced soil structures for a £70 million scheme upgrading the carriageway of the A21, a busy arterial route in Kent.
    SAVE Project
  • URBASTYLE®: Concrete architectural retaining walls for high school
    Concrete architectural retaining walls for high school
    URBASTYLE®
    Barlow RC High School in Didsbury required retaining walls in bespoke shapes and finishes. Architectural concrete retaining walls were provided in a white finish with special bamboo structure engraving. Urbastyle is able to...
    SAVE Project
  • Platipus Anchors Ltd: Percussion Driven Earth Anchors (PDEA®) - Milton Keynes
    Percussion Driven Earth Anchors (PDEA®) - Milton Keynes
    Platipus Anchors Ltd
    Percussion Driven Earth Anchors (PDEA®) from Platipus were specified as part of the solution for 'The Ridge', an acoustic earth bund used to reduce the effect of the M1 on a proposed new housing development in Milton Keynes.
    SAVE Project
  • Greenfix Soil Stabilisation & Erosion Control: Envirolok® - Case Study Kingston University
    Envirolok® - Case Study Kingston University
    Greenfix Soil Stabilisation & Erosion Control
    Following the discovery of instability in an embankment on the Hogsmill River in Kingston upon Thames, Surrey a solution to control further erosion of the island was required. Due to the lack of vehicle access to site, that...
    SAVE Project
  • Phi Group: Gabion baskets support existing stone wall at university
    Gabion baskets support existing stone wall at university
    Phi Group
    Phi Group provided 100m3 of gabion baskets to support an existing stone wall at the University of Huddersfield. Access was restricted due to the canal-side location, so careful planning and sequencing of the work was needed. The...
    SAVE Project
  • Phi Group: Soil nailed slope for University construction site
    Soil nailed slope for University construction site
    Phi Group
    A substantial soil nailed slope was required by the University of Exeter to enable construction of new accommodation blocks for 1200 students. The site topography meant that the slope to the rear need to be excavated into to...
    SAVE Project
  • Keller UK: CFA piling for new flats and offices above rail station
    CFA piling for new flats and offices above rail station
    Keller UK
    Flats and offices are to be created in the space above the platforms at Twickenham Station, which required a piling foundation solution that would allow the rail station to continue to operate without any loss of service. Keller...
    SAVE Project
  • Terram: Permeable gravel car park, Chatham Docks
    Permeable gravel car park, Chatham Docks
    Terram
    Terram Bodpave 85 permeable gravel paving was specified for the 8800m2 car parking area of the Maritime Museum at Chatham Docks. The surface offers a load carrying weight of 400 tonnes/m2 and an environmental requirement for a...
    SAVE Project