1-3 of 3
  • Field trials for reservoir lining materials
    WALO UK
    The owner of Markersbach Reservoir is planning major regeneration in 2015-16. This significant project may require different technical solutions, so four different test areas or field trials have been set up to investigate the...
    SAVE Project
  • Lining replacement, Hornberg upper reservoir
    WALO UK
    The existing asphalt lining of the Hornberg Upper Reservoir, installed 40 years ago, was showing signs of ageing in the slopes facing the sun while the upper part of the slope was vulnerable to the stresses of the constantly...
    SAVE Project
  • Refurbishment of hydropower channel, Middle Isar
    WALO UK
    The main 54km channel of the Middle Isar power station was built between 1921 and 1929. Large scale rehabilitation was required with a complete reconstruction needed of around 3,300m of the channel.
    SAVE Project